Cedar Bayou Update – APRIL 29, 2014

It’s all happening! The barge mounted excavator continues excavating the floatation channel within the dredge template. Other general mobilization operations continue. The barge mounted excavators continue to excavate material from the west side of the dredging template to elevation -4.0’ (NAVD88) and placing material along the east side of the dredge template at Cedar Bayou at approximate STA 69+00. The dredge crew continues to put floats on the dredge pipe and prepare the pipe to be pulled onto land. We will be posting more updates as they come – Thank you to everyone for your support for this important project!

Photos by Lisa Laksowski